| Tenders are listed in reverse-chronological order. Click on the hyperlinks to view/download the documents. | |||||||||||
| Read the instructions on how to submit tenders for publication in official web site. | |||||||||||
| Note: Click on the hyperlink to open/save the document. It is preferable first to 'Save' the document to a local folder and then 'Open' it using appropriate programs. | |||||||||||
| Some of the documents are availabe as PDF (Portable Document Format) files. You need to have Adobe Acrobat Reader installed in your computer to view and print these documents. Click on the image to start downloading Adobe Acrobat Reader. | |||||||||||
|
|
|||||||||||
| Sl.No. | Window No. | Tender No. | Tender Details | Last Date | Tender Notice | |||||||||||||||||||||||||
| 1. | CEG/AEIII/SLM/Panel/08/2009-10 |
Supply of one relay panel for two transformers, one relay panel for two 110KV feeders and one control panel for ring main bus system with 8 breakers for the use at Sengulam Power house |
20-04-2010 | English Malayalam | ||||||||||||||||||||||||||
| 2. | 1. 9/DD/KKD/09-10/04.03.2010 2. 10/DD/KKD/09-10/04.03.2010 |
Renovation of exisitng fence and auxiliary work at Upper Moozhiyar Earthern Dam and Electrification work of Moozhiyar Dam and Gallery |
Malayalam | |||||||||||||||||||||||||||
| 3. | 1. 22/09-10 2. 23/09-10 3. 24/09-10 |
Control Gates operation of Poringalkuthu Dam, Sholayar Dam and Kakkayam Dam for the year 2010-2011 |
Malayalam | |||||||||||||||||||||||||||
| 4. | 1. 17/AEE/R&DSN/KTY/09-10 2. 18/AEE/R&DSN/KTY/09-10 3. 19/AEE/R&DSN/KTY/09-10 |
Providing Security Arrangements for Sengulam Dam, Kallarkutty Dam, Ponmudi Dam, Intake and Sluice for the year 2010-2011 |
Malayalam | |||||||||||||||||||||||||||
| 5. | 1. 19/CSDC/2009-10 2. 20/CSDC/2009-10 3. 21/CSDC/2009-10 |
Providing Security Arrangements for Poringalkuthu Dam, Sholayar Dam and Kakkayam Dam |
Malayalam | |||||||||||||||||||||||||||
| 6. | TRCM 10/09-10/17.02.2010 |
Repairing of 10 MVA 110/11 KV Power Transformer (Sl No.120251-4) at 110 KV Substation Kizhissery |
08-04-2010 | English Malayalam | ||||||||||||||||||||||||||
| 7. | 09/09-10/8-3-10 of Assistant Engineer, Electrical Section, Manakadu |
Supplying efficient and experienced electricity workers to mobile sqard III (Manarkadu mobile squard) from 1/4/10 to 31/3/11 |
27-03-2010 | English | ||||||||||||||||||||||||||
| 8. | PM/UPKLR/04/2009-2010 |
Functioning of Office of the PROJECT MANAGER, Upper Kallar SHP, Peechad SHP&Western Kallar SHP, Kallarkutty-Hiring of Jeep with driver for the period from 04/2010 to 03/2011 |
25-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 9. | 1. Retender No. 3/09-10/DCE/IJK 2. 27/09-10/DCE/IJK 3. 28/09-10/DCE/IJK 4. 29/09-10/DCE/IJK |
Supplying vehicle with driver on contract basis |
25-03-2010 | English | ||||||||||||||||||||||||||
| 10. | PM/UPKLR/05/2009-2010 |
Functioning of Office of the PROJECT MANAGER, Upper Kallar SHP, Peechad SHP&Western Kallar SHP, Kallarkutty-Hiring of a Car with driver for the period from 04/2010 to 03/2011 |
24-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 11. | PR/Window/469/2010 | AEE/SSSD/KNR/54/2009-10 |
110KV Substation, Mundayad - Providing foundation for accommodating the repaired 12.5MVA and 10MVA Transformers |
18-03-2010 | English | |||||||||||||||||||||||||
| 12. | PR/Window/468/10 | SSDK/17/09-10/725/04-03-10 |
Upgradation of 66 kV Substation, Parippally - construction of ACC roof over the existing control room |
20-03-2010 | Malayalam | |||||||||||||||||||||||||
| 13. | PR1/120/Window/465/10 | TCM.55/2009-2010 |
Supply of 1 No. 220kV Busbar Protection Control & Relay Panel |
05-04-2010 | English | |||||||||||||||||||||||||
| 14. | PR/Window/463/2010 | TD/PTA/11/2009-10/4-03-2010 |
Hiring of Diesel car for the use of Transmission Division, Pathanamthitta |
Malayalam | ||||||||||||||||||||||||||
| 15. | PR1/117/Window/461/2010 | AEE/TSD/NTA/07/09- 10/dt 04-03-2010 |
Errection and earthing of supporting structures and equipments of 33 kV Vellarada feeder bay and earth wire earthing at 110 kV Substation, Parassala |
24-03-2010 | English | |||||||||||||||||||||||||
| 16. | PR1/118/Window/459/2010 | 1. 64A 2. 64B 3. 64C 4. 64D 5. 64E |
Sale of Scrap materials at Sub Regional Store, Shoranur |
07-04-2010 | English | |||||||||||||||||||||||||
| 17. | PR1/116/Window/454/2010 | CE(DC)/44/2009-2010/dt. 05-03-2010 |
Supply of Spot Bill Form and Receipt Form |
30-03-2010 | English | |||||||||||||||||||||||||
| 18. | TE- 20/SOC-KNR/2009-10 |
Supply of Clamp meter, Digital & Analog Multimeter for Relay Subdivisions under System Operation Circle, Kannur |
30-03-2010 | English | ||||||||||||||||||||||||||
| 19. | TE-19/SOC-KNR/2009-10 |
Supply of Insulation tester for Relay Division, Kannur |
29-03-2010 | English | ||||||||||||||||||||||||||
| 20. | PR/Window/453/2010 | 9/AEE/TNMS/KLSY/2009-2010 |
Repair and Maintenance work of C1&C3 (Independent) quarters at SLDC colony, Kalamassery |
26-03-2010 | English | |||||||||||||||||||||||||
| 21. | PR/Window/449/2010 | DCE(T)KTR/16(C)/09-10/03-03-2010 |
Hiring of a Diesel Jeep on contract basis for a period of one year for the use at Substation Sub Division, Edamon |
19-03-2010 | English | |||||||||||||||||||||||||
| 22. | PR/Window/445/2010 | 1. 12/PM/THEP/2009-10 2. 13/PM/THEP/2009-10 3. 14/PM/THEP/2009-10 4. 15/PM/THEP/2009-10 |
Hiring of Car with Driver on contract basis |
16-03-2010 | Malayalam Page 2 | |||||||||||||||||||||||||
| 23. | PR1/119/Window/440/2010 | 3/EDM/09-10/11-2-2010 |
Tender Extension Notice-Evacuation of power from 110 KV Substation, Perumbavoor to Electrical Section, Valayanchirangara under Electrical Division, Muvattupuzha |
18-03-2010 | English | |||||||||||||||||||||||||
| 24. | PR/Window/439/10 | 8/KLKD/ESD MVPA/09-10/ dated 20.2.2010 |
Maintenance works to the Electrical Model Section Office Building at Kalloorkadu |
23-03-2010 | English | |||||||||||||||||||||||||
| 25. | PR/Window/438/2010 | TD/PTA/10/2009-10/3-03-2010 |
Hiring of Diesel Jeep with Driver on contract basis for the use of Transmission Sub Division, Thiruvalla |
24-03-2010 | Malayalam | |||||||||||||||||||||||||
| 26. | PR/Window/435/2010 | T11/GCK/2009-10 |
Supply of 12 Nos. air coolers for 2 X 37.5 MW generators at Idamalayar Power Station |
26-03-2010 | English | |||||||||||||||||||||||||
| 27. | 30/ECK/2009-10 |
Painting of Vydyuthi Bhavanam Building and Compound wall at Kottarakkara |
25-03-2010 | English | ||||||||||||||||||||||||||
| 28. | 29/AE4/ECK/2009-10 |
Re-Tender Notice-Maintenance of Vydyuthi Bhavanam Building, Compound wall etc at Kottarakkara |
25-03-2010 | English | ||||||||||||||||||||||||||
| 29. | 14/2009-10/EE/GD/PGL |
PHEP Hiring a jeep for the use of C M Section, Poringalkuthu for one year from 01.04.2010 to 31.03.2011 |
25-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 30. | 1. Re-Tender Notice No. 21/2009-2010 2. Tender Notice No. 22/2009-2010 3. 23/2009-2010 4. 24/2009-2010 5. 25/2009-2010 |
Hiring Taxi Car with Driver on contract basis to Electrical Circle office, Kalpetta, Hiring Taxi Jeep with Driver on contract basis to Electrical Section Thavinjal, Pulpally, Vythiri and Hiring Taxi Tata-Sumo/Toyota-Qualis/Mahindra-Scorpio with Driver on contract basis to the A.P.T.S Regional Unit, Kalpetta |
24-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 31. | 65/09-10/SRR |
Reclamation of scraped transformer oil at Transformer Repair Units under TMR Division, Shoranur |
19-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 32. | PR1/114/Window/432/10 | EE/CDT/Q-3/2009-10 |
Quotation Extension Notice-Running of staff canteen in the 3rd floor of Vydyuthibhavanam building from 01-04-2010 to 31-03-2011 |
10-03-2010 | Malayalam | |||||||||||||||||||||||||
| 33. | PR/Window/426/10 | 220KV/KSD/SSD/001/09-10 |
220 kV Substation, Mylatty, Kasaragod - Painting of 7 Nos. 220/110 kV, 33.33 MVA TELK make single phase Autotransformers and 6 Nos. of fire protection walls at 220kV Substation, Mylatty |
18-03-2010 | English | |||||||||||||||||||||||||
| 34. | PR1/113/Window/425/2010 | 19/09/10/DYCE/TR/TSR |
Disposal of Scrap under Transmission Circle, Thrissur |
26-03-2010 | Malayalam | |||||||||||||||||||||||||
| 35. | 1. 13/AEE/CMSD/2009-10 2. 14/AEE/CMSD/2009-10 |
IHEP Upkeep and maintenance of Moolamattom Colony for 2010-11-Clearing drains, vent ways of culverts and removal of slipped earth and Sanitary arrangements |
26-03-2010 | English | ||||||||||||||||||||||||||
| 36. | 13/2009-10/EE/GD/PGL |
SHEP-Maintenance works to D6,D7,D9 and C4 Quarters at Sholayar camp |
25-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 37. | PR/Window/421/2010 | 18/2009-10 |
Constructing 2.63 km line and 150m UG Cable & allied works under Ele. Section, Krishnapuram |
18-03-2010 | English | |||||||||||||||||||||||||
| 38. | PR1/112/Window/420/2010 | TRC/ALP/17/09-10/08-02-10 |
Tender Extension Notice-Supply of security guards for watch and ward duty at various Substations and construction sites under Transmission Circle, Alappuzha |
19-03-2010 | Malayalam | |||||||||||||||||||||||||
| 39. | PR/Window/413/2010 | 1. 17/DSSD1/IDK/09-10 2. 18/DSSD-1/IDK/09-10 |
IHEP- Security arrangements Kallar & Irattayar Dam supplying watch & ward at dam site and its premises for the year 2010-11 |
English Page 2 | ||||||||||||||||||||||||||
| 40. | TE-21/SOC-KNR/2009-10 |
Supplying one number Diesel Ambassador Car with Driver, Fuel etc. for the departmental use of the Deputy Chief Engineer at System Operation Circle, Kanhirode, Kannur on hire |
22-03-2010 | English | ||||||||||||||||||||||||||
| 41. | 13/EE/MF-2/2009-10 Dated: 18-02-2010 |
Metalling and black topping of internal roads, leveling the site and construction of drain at MF2, Kolathara |
19-03-2010 | English | ||||||||||||||||||||||||||
| 42. | PR1/110/Window/410/2010 | SOC/TVM/2009-2010/13/DTD.01.03.2010 |
Supply, Installation, Testing and Commissioning of 1 No. of Digital EPABX at Vydyuthi Bhavanam, Pattom, Thiruvananthapuram |
18-03-2010 | English | |||||||||||||||||||||||||
| 43. | PR/Window/409/2010 | ECA 12/09-10 and ECA 11/09-10 |
Sale of diesel jeep garaged at Electrical Sub Division, Alappuzha and Poochackal |
16-03-2010 | Malayalam Page 2 | |||||||||||||||||||||||||
| 44. | PR1/109/Window/403/2010 | CE(D-N)/43/2009-10 |
Tender Extension Notice-Manufacture and supply of 7M, 8M and 9M PSC Poles for Electrical Circles for a period of two years |
17-03-2010 | English | |||||||||||||||||||||||||
| 45. | PR1/107/Window/397/2010 | 05/09-10/TSD/CHRY/24.02.10 |
Construction of control room for 33kV substation at Karukachal |
25-03-2010 | English | |||||||||||||||||||||||||
| 46. | 1. AE/CMS/KKM/06/09-10 2. AE/CMS/KKM/07/09-10 3. AE/CMS/KKM/08/09-10 4. AE/CMS/KKM/09/09-10 5. AE/CMS/KKM/10/09-10 |
KHEP - (3x25MW) Extension of existing switch yard of KHEP Power house, O & M of Power House -Leak rectification works over the Control Room roof slab, Repair works to the Kuttiady Generation Division Office building, Painting works to the Butterfly Valve house of KHEP (3x25MW) and KES (1x50MW) and Providing an additional side door to the Power House main building |
19-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 47. | 1. 10/AEE/CMSD/2009-10 2. 12/AEE/CMSD/2009-10 |
IHEP Upkeep and maintenance of Moolamattom Colony- Repairs to buildings for 2010-11 and Circuit House, CH Annex and IB at Moolamattom for 2010-11-supply of labours |
18-03-2010 | English | ||||||||||||||||||||||||||
| 48. | PR1/106/Window/396/2010 | CE(DS)/PC.1/2009-10 dated 20.01.2010 |
Tender Extension Notice-Manufacture and supply of 7m, 8m & 9m PSC pole for six Electrical Circles of Southern Region of KSEB for a period of 3 years |
17-03-2010 | English | |||||||||||||||||||||||||
| 49. | PR/window/395/2010 | T10/GCK/2009-10 |
Replacing faulty air conditioning units with new 11 TR packaged air conditioner with microprocessor controller, 5.5 TR scroll compressor, at Lower Periyar Power Station - 2 Nos. |
17-03-2010 | English | |||||||||||||||||||||||||
| 50. | PR1/105/Window/394/2010 | 1. 57/09-10 2. 58/09-10 3. 59/09-10 4. 60/09-10 5. 61/09-10 |
Sale of scrap and unserviceable items stocked in Sub Regional Store, Kasaragod |
17-03-2010 | English | |||||||||||||||||||||||||
| 51. | 17/09-10/AEE - PND/KLR |
Constructing of compound wall at Electrical Section, Kilikolloor under Electrical Division, Kollam |
16-03-2010 | English | ||||||||||||||||||||||||||
| 52. | 1. PM/O&P/01/2009-10 2. PM/O&P/02/2009-10 |
Geological investigation-Taking core (Nx size- 4 Nos.) using diamond drilling machine for Olikkal Small HE Scheme and Poovaramthodu SHE Scheme |
16-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 53. | DCE(R)/18-27/2009-10 dated 20-02-2010 |
Hiring of vehicles for the use of offices under Electrical Circle Thiruvananthapuram (Rural) |
16-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 54. | PR/Window/392/10 | 18/09-10/SOC/KLY |
Hiring of a TATA SUMO/QUALIS/SPACIO or similar type for Relay Sub Division, Moolamattom |
15-03-2010 | English | |||||||||||||||||||||||||
| 55. | PR1/104/Window/391/2010 | TSDK-13/2009-10 |
Construction of compound wall at 66KV Substation, Mananthavady |
15-03-2010 | Malayalam | |||||||||||||||||||||||||
| 56. | PR1/103/Window/388/2010 | SSCSD-KTDA/4/09-10 dated 24.02.2010 |
Construction of 220kV Sub Station Kattakada-Erection of yard structures & equipments |
17-03-2010 | English Malayalam | |||||||||||||||||||||||||
| 57. | 25/ECK/2009-10 |
Re-Tender Notice-Construction of Electrical Section Office at Punalur |
12-03-2010 | English | ||||||||||||||||||||||||||
| 58. | AEE/TCSD-PLR/09/09-10/22.02.10 |
Supply of Security Guards at 110 kV Substation, Pathanapuram |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 59. | AEE/TSD-PLR/08/09-10/20.02.2010 |
Supply of Security Guards at 110 kV Substation, Punalur |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 60. | AEE/TSD-PLR/09/09-10/20.02.2010 |
Supply of Security Guards at 110 kV Substation, Kottarakkara |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 61. | AEE/TSD-PLR/10/09-10/20.02.2010 |
Supply of Security Guards at 110 kV Substation, Ambalappuram |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 62. | AEE/TSD-PLR/11/09-10/20.02.2010 |
Supply of Security Guards at 66 kV Substation, Ayoor |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 63. | AEE/TSD-PLR/12/09-10/20.02.2010 |
Supply of Security Guards at 33 kV Substation, Ezhukone |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 64. | AEE/TSD-PLR/13/09-10/20.02.2010 |
Supply of Security Guards at 33 kV Substation, Chengamanadu |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 65. | TSD/KDA/22/09-10/Dt: 23.01.10 |
Providing lighting arrangements in 110/33 kV yard, Kottiyam |
11-03-2010 | Malayalam | ||||||||||||||||||||||||||
| 66. | PR/Window/387/10 | 02/RSK/2009-10/18.2.2010 |
Supply of Security Guards for Sub Regional Store, Kundara |
11-03-2010 | Malayalam | |||||||||||||||||||||||||
| 67. | PR/Window/370/10 | 01/PM/SAS/09-10 |
Sengulam Augmentation Scheme - Hiring a diesel car with driver for the use of the office of the Project Manager from 01.04.2010 to 31.03.2011 |
10-03-2010 | English | |||||||||||||||||||||||||
| 68. | 1. 38/R&DSSD II/IDK/2009-10 2. 39/R&DSSD II/IDK/2009-10 3. 40/R&DSSD II/IDK/2009-10 4. 41/R&DSSD II/IDK/2009-10 |
Supplying of Security Guards |
Malayalam | |||||||||||||||||||||||||||
| 69. | 1. 3/DD/KKD/09-10/17.02.2010 2. 4/DD/KKD/09-10/17.02.2010 3. 5/DD/KKD/09-10/17.02.2010 4. 6/DD/KKD/09-10/17.02.2010 5. 7/DD/KKD/09-10/17.02.2010 6. 8/DD/KKD/09-10/17.02.2010 |
Electrification of Anathodu Dam Gallery, fencing work at Pamba IB, installing lights at Anathodu Dam top, Electrification of Pamba Dam Gallery, Concrete work at Moozhiyar Dam Gallery and Maintenance work at Pamba Dam Colony Canteen |
Malayalam | |||||||||||||||||||||||||||
| 70. | 1. 36/R&DSSD-2/IDK/2009-10 2. 37/R&DSSD 2/IDK/2009-10 |
Maintenance work of 3 Spillway shutters at Pallivasal HEP - Mattupetty Dam and Renovation work of IHEP-Painavu Electrical Sub Division office building |
Malayalam | |||||||||||||||||||||||||||
| 71. | PR1/96/Window/368/2010 | TN19/09-10/AEE/PTCD/Dt. 16-02-2010 |
Yard remetalling of 110 kV side of 200MVA TELK Transformer at 220 kV Substation, Pothencode |
10-03-2010 | English | |||||||||||||||||||||||||
| 72. | PR/Window/362/2010 | BDPP/EE/MM/74/09-10 |
BDPP Providing necessary assistance in the upkeep and operation of the Departmental Inspection Bungalow functioning at Vyttila for the period from 1.04.2010 to 31.03.2011 Supply Ex-Service Men preferably in the trade Cook |
16-03-2010 | English | |||||||||||||||||||||||||
| 73. | 09/09-10 |
Replacing 66 kV ABCB, MOCB and installing SF6 CB at 220 kV Substation, Poovanthuruthu |
Malayalam | |||||||||||||||||||||||||||
| 74. | TRCM 11/09-10/17.02.2010 |
Repairing of 10 MVA 110/11 KV Power Transformer (Sl No.120290-4) at 110 KV Substation Kizhissery |
08-04-2010 | English Malayalam | ||||||||||||||||||||||||||
| 75. | CE (DC)/36/2009-10 dt. 19/01/2010 |
Tender Extension Notice-Manufacture and supply of 7m, 8m, and 9m PSC poles to the Electrical Circles under central region for a period of three years |
17-03-2010 | English | ||||||||||||||||||||||||||
| 76. | 1. 15/09-10 2. 16/09-10 3. 17/09-10 |
Disposal of old and unserviceable items in various Substations and Transmission Circle store under Transmission Circle, Kozhikode (Nallalam) |
16-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 77. | 18/DCE/PBVR/2/09-10 |
Disposal of unserviceable Single phase meter scrap (45382 Kg) 3 phase meter scrap (13796 Kg) iron scrap (12213 Kg) Aluminium scrap (13616 Kg), ACSR scrap (13412 Kg) and Copper Scrap (600 Kg) (Weight approximate) at Circle Store Perumbavoor situated at Aluva |
15-03-2010 | English Malayalam | ||||||||||||||||||||||||||
| 78. | 17/09-10/SOC/KLY |
Hiring of a Diesel Jeep for Communication Sub Division, Pallom |
15-03-2010 | English | ||||||||||||||||||||||||||
| 79. | PR/Window/356/10 | GCM-T-15/09-10 |
Hiring a Jeep with driver for the use of Generation Division, Chithirapuram for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 80. | PR/Window/355/2010 | GCM-T-16/09-10 |
Hiring a car with driver for the use of Generation Division, Chithirapuram for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 81. | PR/Window/354/2010 | GCM-T-17/09-10 |
Hiring a 10 seated jeep with driver for the use of Generation Sub Division, Chithirapuram for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 82. | PR/Window/353/2010 | GCM-T-18/09-10 |
Hiring a 10 seater jeep with driver for the use of Generation Sub Division, Vellathooval for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 83. | PR/Window/352/2010 | GCM-T-19/09-10 |
Hiring a 10 seater jeep with driver for the use of Neriamangalam Power House for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 84. | PR/Window/351/2010 | GCM-T-20/09-10 |
Hiring a car with driver for the use of Executive Engineer, Generation Division, Kallarkutty for a period of one year from 1-04-2010 |
10-03-2010 | English | |||||||||||||||||||||||||
| 85. | PR/Window/346/2010 | TD/PTA/09/2009-10/19-02-2010 |
Hiring of Diesel car for the use of Transmission Division, Pathanamthitta |
Malayalam | ||||||||||||||||||||||||||
| 86. | PR1/85/Window/340/2010 | EE/ED/KZM 3/09-10dt 19.02.2010 |
Laying of 11 Km 300 Sq mm 11KV XLPE UG cable from 110KV Terls S/S to M/s. Brahmos Aerospace Ltd., Thiruvananthapuram and connected works under Electrical section, Beach |
12-03-2010 | English Malayalam | |||||||||||||||||||||||||
| 87. | PR1/93/Window/336/2010 | BDPP/DCE/21/09-10 |
BDPP-Providing security arrangements to the plant and properties coming under BDPP for the period from 01.04.2010 to 31.03.2011 |
16-03-2010 | English | |||||||||||||||||||||||||
| 88. | 10/2009-10/EE/GD/PGL |
PHEP-Painting the out side walls of Old Power House Building at Poringalkuthu |
11-03-2010 | English | ||||||||||||||||||||||||||
| 89. | 06/TCSD/MVK/2009-10 |
Construction of 33KV Substation, Kattanam Construction of chain link fencing, Yard road and Yard lighting |
10-03-2010 | English | ||||||||||||||||||||||||||
| 90. | 07/TCSD/MVK/2009-10 |
Construction of 33KV Substation, Kattanam Yard metalling |
10-03-2010 | English | ||||||||||||||||||||||||||
| 91. | PR1/94/Window/329/2010 | 1. R-19C/2009-10 2. R-19E/2009-10 |
Re-Tender Notice-Disposal of scrap items available at Sub Regional Store, Manjeri |
12-03-2010 | English | |||||||||||||||||||||||||
| 92. | PR1/92/Window/328/2010 | CE (DC)/37/2009-10 Dtd. 03/02/2010 |
Tender Extension Notice-Supply, installation, testing & commissioning of fully automatic, 20 positions Three Phase/Single Phase, energy meter Test bench |
17-03-2010 | English | |||||||||||||||||||||||||
| 93. | PR/Window/323/2010 | 3/EDM/09-10 |
Re-Tender Notice-Evacuation of power from 110KV substation Perumbavoor to Electrical Section, Valayanchirangara |
09-03-2010 | English | |||||||||||||||||||||||||
| 94. | PR1/90/Window/316/2010 | CE(DS)/PC.1/2009-10 dated 20.01.2010 |
Tender Sale Extension Notice-Manufacture & supply of 7m, 8m & 9m PSC pole for six Electrical Circles of Southern Region of KSEB for a period of 3 years |
09-03-2010 | English | |||||||||||||||||||||||||
| 95. | PR1/88/Window/306/2010 | 1. TRC/ALP/02/2009-10 2. TRC/ALP/03/2009-10 |
Sale of unusable items kept at Transmission Circle Store, Alappuzha and 110KV Substation, Aroor |
22-03-2010 | Malayalam | |||||||||||||||||||||||||
| 96. | PR1/87/Window/304/2010 | CE (DC)/41/2009-10 Dtd. 11/02/2010 |
Supply of 10,525 Nos 11 kV, 50 Amp Drop out Fuses |
11-03-2010 | English | |||||||||||||||||||||||||
| 97. | PR1/82/Window/298/2010 | TCP/DBC/13/09-10 |
Construction of Control Room Building at 110 kV Substation Kodimatha |
10-03-2010 | English | |||||||||||||||||||||||||
| 98. | PR1/86/Window/294/2010 | CECCN/8/2009-10 |
Hot dip galvanizing of 425 MT electrical line materials such as cross arm, clamps, V-cross arm etc. fabricated at Mechanical Facility - II Kolathara, Kozhikode |
16-03-2010 | English | |||||||||||||||||||||||||
| 99. | PR/Window/283/2010 | 10/2009-10/DyCE/GEN/TSR |
Re-Scheduling of Re-Tender Notice-Sale of used and old unserviceable item of the Kerala State Electricity Board at the premises of Generation Sub Division, Poringalkuthu in the jurisdiction of Generation Circle, Thrissur |
10-03-2010 | English Malayalam | |||||||||||||||||||||||||
| 100. | PR/Window/273/2010 | ECT 24/09-10 |
Leasing out shop No.4 in Vydyuthi Bhavanam Complex at Thodupuzha |
10-03-2010 | Malayalam | |||||||||||||||||||||||||
| 101. | PR1/71/Window/272/2010 | TRC/ALP/17/2009-10 |
Supply of security guards for watch and ward duty at various Substations and construction sites under Transmission Circle, Alappuzha |
11-03-2010 | English | |||||||||||||||||||||||||
| 102. | PR1/70/Window/269/2010 | CE(D-N)/43/2009-10 |
Tender Extension Notice-Manufacture and supply of 7M, 8M and 9M PSC Poles for Electrical Circles for a period of two years |
09-03-2010 | English | |||||||||||||||||||||||||
| 103. | PR/Window/268/2010 | ESDP 12/2009-10/PTM/24.12.09 |
11 kV U G Cable laying and 100 kV Transformer installation work under Electrical Sub Division, Palarivattom |
Malayalam | ||||||||||||||||||||||||||
| 104. | PR1/68/Window/264/2010 | 43R/TCT/Vehicle/2009-10 |
Hiring of Diesel Jeep for the use of Transmission Sub Division, Veli |
Malayalam | ||||||||||||||||||||||||||
| 105. | PET- Tender 02/2009-10 |
Housekeeping and Gardening at PETARC Office & Hostel for a period of 180 days |
English | |||||||||||||||||||||||||||
| 106. | PET- Tender 03/2009-10 |
Providing catering services at PETARC Hostel for a period of six months |
English | |||||||||||||||||||||||||||
| 107. | PR1/64/Window/236/2010 | EE TDN-SRR/06/09-10/Pathirippala |
Capital work at 110Kv Substation, Pathirippala-Site levelling and construction of Compound wall at 110kv substation, Pathirippala |
18-03-2010 | Malayalam | |||||||||||||||||||||||||
| 108. | PR1/59/Window/217/2010 | CE (DC)/37/2009-10 dt. 03/02/2010 |
Supply, installation, testing & commissioning of, fully automatic, 20 positions three Phase/Single Phase energy meter test bench |
03-03-2010 | English | |||||||||||||||||||||||||
| 109. | PR1/60/Window/216/2010 | CECCN/07/2009-10 |
Execution of Barapole Small Hydro Electric Project 15 MW (3 X 5 MW) |
06-04-2010 | English Malayalam | |||||||||||||||||||||||||
| 110. | PR1/Window/210/2010 | 1. TCP/DBC/9/09-10 2. TCP/DBC/10/09-10 |
Re-Tender Notice-Hiring of Vehicle with driver on contract basis |
Malayalam | ||||||||||||||||||||||||||
| 111. | PR1/50/Window/193/2010 | 1. 41 R/TCT/Vehicle/2009-10 2. 42/TCT/Vehicle/2009 10 |
Hiring of Diesel Jeep on contract basis |
Malayalam | ||||||||||||||||||||||||||
| 112. | DCE/51/09-10 to DCE/59/09-10 |
Hiring of Vehicles for the use of offices under Electrical Circle (Urban), Thiruvananthapuram |
Malayalam | |||||||||||||||||||||||||||
| 113. | 14/AEE/DSI/IDR/2009-10 |
PHEP- Cement washing to the downstream face of Poringalkuthu dam |
English Malayalam | |||||||||||||||||||||||||||
| 114. | PR1/34/Window/134/2010 | CE (DC)/36/2009-10 |
Manufacture and supply of 7m, 8m, and 9m PSC poles to the Electrical Circles under central region for a period of three years |
17-03-2010 | English | |||||||||||||||||||||||||
| 115. | PR1/35/Window/133/2010 | CE(DS)/PC1/2009-10 |
Manufacture and supply of 7m, 8m & 9m PSC poles for six Electrical Circles of southern region of K.S.E.B for a period of 3 years |
09-03-2010 | English | |||||||||||||||||||||||||
| 116. | DB10/Tender No. 1/CTR/09-10/14.1.2010 |
Repair, Maintenance of Electrical Section Office, Chittur |
Malayalam | |||||||||||||||||||||||||||
| 117. | PR1/22/Window/86/2010 | CE(DN) 43/2009-10 |
Manufacture and supply of 7M, 8M and 9M PSC Poles for the Electrical Circles for a period of two years |
09-03-2010 | English Malayalam | |||||||||||||||||||||||||
| 118. | PR1/390/Window/2064/09 | CECCS/04/2009-10 |
Execution of civil works of Anakkayam Small Hydro Electric Project 7.5MW (3 X 2.5) MW |
17-03-2010 | English Malayalam | |||||||||||||||||||||||||